Skip to main content

Box 38

 Container

Contains 20 Results:

Miami River Bridge, undated

 File — Box: 38, Folder: 1
Scope and Contents From the Sub-Series:

Bridge proposals include correspondence, notes, drawings, specifications and estimates made by Washington A. Roebling. The proposals include several military bridges designed by Roebling during the Civil War, consultations on and histories of bridges built by John A. Roebling, and the Hudson River Bridge which Roebling endorsed.

Dates: Created: undated

Albany Bridge, Hudson River, 1855

 File — Box: 38, Folder: 1
Scope and Contents From the Sub-Series:

Bridge proposals consist of correspondence, notes, drawings, specifications and estimates made by John A. Roebling. Of particular interest in this series is the Kentucky River Bridge which Roebling started but did not complete, the Tripartite Bridge, a creative solution to bridging the three rivers of Pittsburgh, and the St. Louis River Bridge proposal which was turned down in favor of James Eads’s design.

Dates: Created: 1855

Birmingham Point Bridge - Pittsburgh, 1855

 File — Box: 38, Folder: 3
Scope and Contents From the Sub-Series:

Bridge proposals consist of correspondence, notes, drawings, specifications and estimates made by John A. Roebling. Of particular interest in this series is the Kentucky River Bridge which Roebling started but did not complete, the Tripartite Bridge, a creative solution to bridging the three rivers of Pittsburgh, and the St. Louis River Bridge proposal which was turned down in favor of James Eads’s design.

Dates: Created: 1855

Broadway Overhead Railroad, 1868

 File — Box: 38, Folder: 4
Scope and Contents From the Sub-Series:

Bridge proposals consist of correspondence, notes, drawings, specifications and estimates made by John A. Roebling. Of particular interest in this series is the Kentucky River Bridge which Roebling started but did not complete, the Tripartite Bridge, a creative solution to bridging the three rivers of Pittsburgh, and the St. Louis River Bridge proposal which was turned down in favor of James Eads’s design.

Dates: Created: 1868

Chestnut Street Bridge, Philadelphia, 1851

 File — Box: 38, Folder: 5
Scope and Contents From the Sub-Series:

Bridge proposals consist of correspondence, notes, drawings, specifications and estimates made by John A. Roebling. Of particular interest in this series is the Kentucky River Bridge which Roebling started but did not complete, the Tripartite Bridge, a creative solution to bridging the three rivers of Pittsburgh, and the St. Louis River Bridge proposal which was turned down in favor of James Eads’s design.

Dates: Created: 1851

Military Bridge, Kentucky River, 1863

 File — Box: 38, Folder: 2
Scope and Contents From the Sub-Series:

Bridge proposals include correspondence, notes, drawings, specifications and estimates made by Washington A. Roebling. The proposals include several military bridges designed by Roebling during the Civil War, consultations on and histories of bridges built by John A. Roebling, and the Hudson River Bridge which Roebling endorsed.

Dates: Created: 1863

Barryville Footbridge, c1847

 File — Box: 38, Folder: 2
Scope and Contents From the Sub-Series:

Bridge proposals consist of correspondence, notes, drawings, specifications and estimates made by John A. Roebling. Of particular interest in this series is the Kentucky River Bridge which Roebling started but did not complete, the Tripartite Bridge, a creative solution to bridging the three rivers of Pittsburgh, and the St. Louis River Bridge proposal which was turned down in favor of James Eads’s design.

Dates: Created: c1847

Clarks Ferry Bridge, 1852

 File — Box: 38, Folder: 6
Scope and Contents From the Sub-Series:

Bridge proposals consist of correspondence, notes, drawings, specifications and estimates made by John A. Roebling. Of particular interest in this series is the Kentucky River Bridge which Roebling started but did not complete, the Tripartite Bridge, a creative solution to bridging the three rivers of Pittsburgh, and the St. Louis River Bridge proposal which was turned down in favor of James Eads’s design.

Dates: Created: 1852

Market Street Bridge, Philadelphia, c1850

 File — Box: 38, Folder: 7
Scope and Contents From the Sub-Series:

Bridge proposals consist of correspondence, notes, drawings, specifications and estimates made by John A. Roebling. Of particular interest in this series is the Kentucky River Bridge which Roebling started but did not complete, the Tripartite Bridge, a creative solution to bridging the three rivers of Pittsburgh, and the St. Louis River Bridge proposal which was turned down in favor of James Eads’s design.

Dates: Created: c1850

Milford, Pennsylvania Bridge, 1869

 File — Box: 38, Folder: 8
Scope and Contents From the Sub-Series:

Bridge proposals consist of correspondence, notes, drawings, specifications and estimates made by John A. Roebling. Of particular interest in this series is the Kentucky River Bridge which Roebling started but did not complete, the Tripartite Bridge, a creative solution to bridging the three rivers of Pittsburgh, and the St. Louis River Bridge proposal which was turned down in favor of James Eads’s design.

Dates: Created: 1869